Hello,
I have scheduled different backup jobs. Most of them runs without any problem. But there are 3 jobs that doesn’t run ok. It seems to te that it start at the scheduled time but halfway it stops. I see in the log file that it has begun with the backup job but halfway the log file stops.
When i run the job by hand in Attended mode it runs correctly. The log file then is also complete.
What could it be?
Thanks in Advance.